Excel import and export for AutoCAD Plant 3D.

Export the project rows you need. Edit allowed values in Excel. Review the changes in RKCadTools Data Manager before applying them to your drawings.

Windows · AutoCAD Plant 3D 2024–2027
Part of RKCadTools · No payment details required for the trial

Data Manager with 3D Piping rows, a class tree and selected project properties.
Choose the classes, fields and rows for a focused Excel export.

A spreadsheet review with a clear route back to the model.

Use Data Manager when existing P&ID or 3D Piping properties need a focused review: an equipment list, a set of valve descriptions or project-specific fields. Load a drawing or the full project, choose the relevant classes and save the view for the next review.

Choose the scope

Export the filtered rows and visible columns you need, across the selected classes.

Keep object identity

The exported workbook carries a hidden object key so imported values can be matched to the original project objects.

Decide what is applied

Import stages pending changes. Inspect old and new values, exclude individual changes and choose Accept when ready.

From project data to Excel, then back through review.

For a first run, use a project copy and a small selection with one editable property.

1. Load and export

Open Data Manager. Choose P&ID or 3D Piping, drawing or project scope, classes and fields. Filter the rows, then choose Export Excel to create an .xlsx workbook.

2. Edit allowed values

Change only the unlocked green cells in the exported workbook. Keep the headers, hidden object key and row identity intact. Use the workbook from the same project.

3. Import and review

Choose Import Excel, then Review changes. Compare the old and new values and exclude changes you do not want. Imported values remain pending until you accept them.

4. Accept and save

Choose Accept to apply the remaining changes. Check the result, then save and, where required, check in the affected drawings through your usual Plant 3D workflow.

Check the differences before they reach your drawings.

Excel import and direct table edits use the same pending-change workflow. Review changes lets you search the pending set, compare previous and proposed values and leave out individual changes. Use Discard to cancel pending changes.

Import also creates a marked .import-result.xlsx copy when there are comments to report. It explains skipped rows and records staged before/after changes on an RKCadTools Import Changes sheet. This import report is created before Accept; it is a review record, not confirmation that every proposed change has been applied.

Data Manager with two pending changes and the Review changes, Accept and Discard actions.
Pending changes remain reviewable before Accept. This screenshot shows the table review state.

Plant 3D stays in control of editable properties.

RKCadTools applies accepted object-property changes through Plant 3D’s property APIs. An Excel workbook does not bypass the project’s property rules.

  • Edit existing properties. This workflow updates existing project objects; it does not create classes, properties or new model objects from spreadsheet rows.
  • Respect locked values. Read-only, acquired, inherited, calculated and tag-controlled values cannot be overwritten through Excel import. Change tags with Plant 3D’s tag workflow.
  • Check the import scope. Selected classes and current search or temporary filters determine which rows can be matched. Rows hidden by those filters are skipped.
  • Keep the exported structure. Preserve the hidden object key and headers. Re-export if the workbook’s identity columns are missing or uncertain.

An exported workbook or an external data source?

Data Manager: review and return

Choose Data Manager when you want to export selected project data, edit the exported workbook and import allowed values back into those objects. The workbook retains the object identity.

Learn the Data Manager workflow →

Data Bridge: map and sync

Choose Data Bridge when your source is a separate equipment list, part master or database. Configure matching conditions and property mappings for Excel, SQLite, SQL Server or OData, then review the proposed sync.

See external data synchronization →

Try one real Excel review on a project copy.

Download RKCadTools for AutoCAD Plant 3D 2024–2027 and start the free 15-day trial from inside the plugin. Begin with a small export, change one allowed field and follow it through review and Accept.

Need help choosing a data workflow? Contact RKCadTools.

RKCadTools

Welcome back

Sign in to manage licenses, activated computers, purchases, and billing.

Use your existing RKCadTools account, including a free Component Studio account. In My Account, register your company to buy and manage licenses. Creating a company does not start a trial or subscription.

New here? Create a free account in Component Studio, then return here to sign in, or contact us about a company purchase.